HUNTER RIVER TRENCHLESS CROSSING

Project Start Date

December 2016

Project Completion Date

September 2017

Client

Hunter Water Corporation

Comdain's Role

Principal Contractor

Location

New South Wales

Capabilities

Distribution Infrastructure

Download PDF

Design and installation of two trenchless crossings of the Hunter River and installation of two Flow Control Valves.

Works Undertaken

  • Detail design of two 1500mm diameter trenchless crossings with bore diameter of 1500mm
  • Construction of two 400m long trenchless crossings under the Hunter River and installation of two 1200mm outside diameter HDPE carrier mains
  • Construction of two Flow Control Valves including the associated MSCL pipework, valving, electrical, telemetry and power supply
  • Construction of connecting MSCL pipework and tie-in to existing Newcastle potable water supply pipeline

Highlights & Innovations

  • Horizontal Directional Drilling through varying geotechnical conditions.
  • Successful tie-in of newly constructed pipelines to existing infrastructure either side of the river within strict 12 hour shutdowns.
  • Safely working around existing infrastructure including a major Sydney to Brisbane optic fibre cable and high voltage overhead power transmission cables.
  • Alignment of the 320m, DN1200 welded pipe string that didn’t impact local residents, prior to being pulled through under the river.
  • Working in close proximity to a family residence on the northern side of the river.